Environmental management

Environmental management

Platte River Power Authority operates its generation resources with a strong commitment to environmental responsibility. A comprehensive Environmental Management System (EMS) guides day‑to‑day operations, ensures compliance with all applicable environmental laws and regulations, and supports continuous improvement across air quality, water management and coal ash handling.

The EMS includes both administrative and technical components and provides a structured framework for:

  • Setting and achieving environmental goals
  • Maintaining regulatory compliance
  • Monitoring performance
  • Reducing environmental risks
  • Supporting transparent communication with regulators and the public

Platte River’s environmental practices are grounded in proactive planning, responsible operations and continuous improvement. As new legislation and regulations emerge, Platte River participates in public processes and supports additional control requirements when costs are commensurate with measurable environmental benefits. As technology evolves, Platte River evaluates and implements improvements that balance environmental, operational and socio economic considerations.

Guiding principles

These principles shape Platte River’s environmental decision‑making:

  • Consider environmental factors in planning, design, construction and operations
  • Ensure compliance with all applicable laws, rules, regulations and permits
  • Conserve natural resources
  • Reduce environmental risks
  • Encourage pollution prevention
  • Communicate environmental values
  • Encourage public participation
  • Support cost‑effective energy conservation programs
  • Coordinate generation and transmission planning with neighboring utilities
  • Consider environmentally progressive technologies for future needs

More resources

Coal ash management

Platte River utilizes low-sulfur Powder River Basin subbituminous coal and responsibly manages the byproducts created.

Emissions control

Rawhide Unit 1’s enhanced low-NOx combustion control system uses the latest in boiler burner technology.

Nitrogen oxides reduction

State-of-the-art emissions controls and other measures help Platte River operate responsibly.

Water management

Rawhide operates as a zero-liquid discharge facility, which means all cooling water, process water, and industrial stormwater is managed on-site.

Accessibility notice:
Per the Americans with Disabilities Act (ADA), Platte River Power Authority will provide reasonable accommodation to qualified individuals with a disability who need assistance. Please email us at [email protected] or call 970-226-4000. “Walk-in” requests for auxiliary aids and services may be honored to the extent possible but can be unavailable if advance notice is not provided.

TOP